Blue Yonder Inc: VA HVAC and plumbing contracts
Blue Yonder Inc (UEI PTSCYLWKCFK3) has won 10 VA heating, cooling and plumbing contracts since October 2018, worth $17.0 million, at 4 locations. 2 are still active.
Where does Blue Yonder Inc work for the VA?
- Chicago, IL: 5 contracts
- North Chicago, IL: 2 contracts
- Hines, IL: 2 contracts
- Joliet, IL: 1 contract
Contracts
| Contract | Description | Location | Obligated | Start | End |
|---|---|---|---|---|---|
| 36C25226C0032 | Construction contract for project 556-23-127 surgical HVAC systems replacement construction at the captain james a lovell federal health care center (fhcc), north chicago, illinois. | North Chicago, IL | $5.9 million | May 28, 2026 | Jul 19, 2027 |
| 36C25225C0016 | Project: 578-17-012 replace AHUS bldg. 45 | Hines, IL | $4.4 million | Mar 5, 2025 | Mar 23, 2027 |
| 36C25224P0763 | Repairs of the vdf pumps | Joliet, IL | $2,933 | Jul 8, 2024 | Jul 31, 2025 |
| 36C25222C0042 | Project 556-20-002: replace greenhouse hones HVAC at the north chicago fhcc. | North Chicago, IL | $4.7 million | Apr 21, 2022 | Mar 18, 2024 |
| 36C25220P0805 | Repair of the secondary economizer fan at boiler plant and new controls at building 205 hines VA hospital hines | Hines, IL | $42,180 | Aug 1, 2020 | Oct 31, 2020 |
| 36C25220P0787 | The contractor shall provide air handling unit maintenance at the jesse brown VAMC located in chicago, illinois. | Chicago, IL | $24,724 | Jul 21, 2020 | Sep 8, 2020 |
| 36C25219C0091 | 537-18-136A AHU 5 follow-on: corrections to HVAC and BAS system for AHU 5. | Chicago, IL | $1.6 million | Mar 7, 2019 | Aug 28, 2020 |
| 36C25219P0425 | Hepa filter replacement at jesse brown VAMC | Chicago, IL | $19,511 | Jan 24, 2019 | Apr 19, 2019 |
| 36C25219C0055 | Relocate blue pipe project calls for the relocation of a section of the 2 inch dialysis sanitary drain piping on the 3RD floor mechanical room of building 40 (bed tower). the added piping consists of 2 inch dialysis acid waste piping made of fire retardant polypropylene. pipe and fittings shall be joined using the no-hub method, utilizing plain end factory groove fittings joined with no-hub couplings. | Chicago, IL | $25,409 | Jan 11, 2019 | May 8, 2019 |
| 36C25219P0302 | Hydronic system repair | Chicago, IL | $251,590 | Dec 20, 2018 | Apr 30, 2019 |