VA contract 36C24826P0597: Urgent domestic water pump skid building 1
Ost Services, LLC holds VA contract 36C24826P0597 for urgent domestic water pump skid building 1 in Tampa, FL. It started on Apr 23, 2026, and $369,975 has been obligated so far. The VA received a single offer. The current period runs until Apr 22, 2027.
| Contract number | 36C24826P0597 |
|---|---|
| Contract holder | Ost Services, LLC |
| Holder UEI | MUPCLDFAHJK5 |
| Description | Urgent domestic water pump skid building 1 |
| Location | Tampa, FL |
| Contracting office | VA Network Contract Office 8 (36C248) |
| Obligated to date | $369,975 |
| Start date | Apr 23, 2026 |
| Current end date | Apr 22, 2027 |
| Offers received | 1 |
| Set-aside | SDVOSB sole source |
| Competition | Not available for competition |
| Kind of work | Installation |
| Official record | USAspending.gov |
Details come from the official record on USAspending.gov. Confirm them there before relying on them.
Other VA HVAC and plumbing contracts in Tampa, FL
- 36C24826P0604: Replacement of supply and fuel lines in building 54, $58,084, ended Sep 22, 2026
- 36C24825P1992: Water treatment boiler and chiller, $328,836, ends Dec 14, 2026
- 36C24825P2129: Installation of domestic pump skid, $248,000, ended Sep 14, 2026
- 36C24825P0279: Emergency repair pressure reducing valve, $17,885, ended Dec 31, 2024
- 36C24824C0074: Replace AHU ED-203, $1.7 million, ends Nov 25, 2026
- 36C24824P1797: Emergency rental boiler installation for steam system shutdown, $48,500, ended Jul 29, 2024
- 36C24824P1258: Boiler inspection, testing and calibration service, $168,185, ends May 16, 2027
- 36C24824P0800: Replace roof top unit (RTU) bldg T56, $38,650, ended May 10, 2024
Other VA contracts held by Ost Services, LLC
- 36C24825P2129: Installation of domestic pump skid, $248,000, ended Sep 14, 2026
- 36C24825P0279: Emergency repair pressure reducing valve, $17,885, ended Dec 31, 2024
- 36C24824P1797: Emergency rental boiler installation for steam system shutdown, $48,500, ended Jul 29, 2024
- 36C24824P0800: Replace roof top unit (RTU) bldg T56, $38,650, ended May 10, 2024
- 36C24823P2051: Secondary pump #2 repair, $9,855, ended Jul 28, 2023
- 36C24823C0067: Install fan array AHU OR 2-7, $665,334, ended Apr 18, 2024
- 36C24823P1106: Emergency chiller and gear repair, $109,590, ended Jul 5, 2023
- 36C24822P2295: Emergency replacement of two York air cooler chillers in building 30, $560,000, ended May 31, 2023