VA contract 36C25219P0662: Blast chiller/shock freezer
Aldevra LLC held VA contract 36C25219P0662 for blast chiller/shock freezer in Iron Mountain, MI. It started on Apr 2, 2019, and $13,944 has been obligated so far. The VA received a single offer. This contract ended on Apr 29, 2019.
| Contract number | 36C25219P0662 |
|---|---|
| Contract holder | Aldevra LLC |
| Holder UEI | WF95AG13LN37 |
| Description | Blast chiller/shock freezer |
| Location | Iron Mountain, MI |
| Contracting office | VA Network Contract Office 12 (36C252) |
| Obligated to date | $13,944 |
| Start date | Apr 2, 2019 |
| Current end date | Apr 29, 2019 |
| Offers received | 1 |
| Set-aside | Service-disabled veteran-owned small business (SDVOSB) set-aside |
| Competition | Competed (simplified acquisition) |
| Kind of work | Equipment |
| Official record | USAspending.gov |
Details come from the official record on USAspending.gov. Confirm them there before relying on them.
Other VA HVAC and plumbing contracts in Iron Mountain, MI
- 36C25226C0025: Replace condensate lines and pumps at the oscar g johnson VAMC at iron mountain, mi, $1.4 million, ends Oct 20, 2026
- 36C25225P1115: Emergency storm water main repair at the oscar g. johnson VA medical center in iron mountain mi, $22,250, ended Sep 8, 2025
- 36C25224P0623: Testing and inspection of fire sprinkler system, $29,526, ends May 31, 2029
- 36C25224P0246: Building automation system maintenance at oscar johnson VA medical center, iron mountain, mi, $69,401, ends Mar 31, 2029
- 36C77623N0458: Boiler safety testing and training, $11,412, ended Jun 30, 2024
- 36C25223C0023: Project 585-21-116 replace chiller plant (phase 2). this project involves the replacement of three of the existing 250-TON chillers for future cooling demand, $5.3 million, ended Feb 28, 2026
- 36C25222P0767: Project 58521-116 - replace chiller plant construction at the oscar g. johnson VA medical center in iron mountain, mi, $344,000, ended Apr 12, 2023
- 36C25222C0025: Project 585-19-118 includes the installation of new potable risers and associated isolation valves to the cold, hot and hot water return piping at the oscar g. johnson VA medical center in iron mountain, mi, $3.7 million, ended Aug 10, 2023
Other VA contracts held by Aldevra LLC
- 36C24124P0437: Preventative maintenance, $77,592, ends Mar 30, 2027
- 36C25623P0844: Chilled water coils replacement x 2, $26,917, ended Aug 30, 2023
- 36C25622P1356: In-row cooler maintenance for the new Orleans, la VAMC, $932,781, ends Aug 31, 2027