VA contract 36C25720P0159: Sps fan coil replacement and repair work
Allied Hvacr Services, Inc. held VA contract 36C25720P0159 for sps fan coil replacement and repair work in Kerrville, TX. It started on Nov 27, 2019, and $23,914 has been obligated so far. The VA received a single offer. This contract ended on Dec 31, 2019.
| Contract number | 36C25720P0159 |
|---|---|
| Contract holder | Allied Hvacr Services, Inc. |
| Holder UEI | TNAHY7SC87Z3 |
| Description | Sps fan coil replacement and repair work |
| Location | Kerrville, TX |
| Contracting office | VA Network Contract Office 17 (36C257) |
| Obligated to date | $23,914 |
| Start date | Nov 27, 2019 |
| Current end date | Dec 31, 2019 |
| Offers received | 1 |
| Set-aside | Small business set-aside |
| Competition | Competed (simplified acquisition) |
| Kind of work | Maintenance repair |
| Official record | USAspending.gov |
Details come from the official record on USAspending.gov. Confirm them there before relying on them.
Other VA HVAC and plumbing contracts in Kerrville, TX
- 36C25726P0575: Stx - Kerrville VA chiller maintenance services, $26,964, ends Jul 20, 2027
- 36C25725C0022: Project # 671A4-22-172 replace medical air & vac system, $363,036, ended Dec 5, 2025
- 36C77622N2365: Boiler safety testing and training, $8,680, ended Aug 18, 2022
- 36C25722P0456: Boiler efficiency institute for 3 thermal heaters and 3 steam generators. four honeywell ML7999 actuators, install one actuator, check/set combustion verify proper equipment operation clean work area perform repairs for an operational boiler plant, $146,149, ended Sep 30, 2022
- 36C25722P0345: Install gas heat unit building #119, $28,245, ended Mar 31, 2022
- 36C25721P1246: Re-insulation of chilled water lines, $15,660, ended Feb 8, 2022
- 36C25721P1022: Chiller and cooling tower maintenance, $365,746, ended Jul 8, 2026
- 36C25720P1220: Demolish and remove existing 5-TON air conditioning package in accordance with the sow, $10,931, ended Aug 28, 2020
Other VA contracts held by Allied Hvacr Services, Inc.
- 36C25720P1220: Demolish and remove existing 5-TON air conditioning package in accordance with the sow, $10,931, ended Aug 28, 2020