| 36C25726P0762 | Repair duct and chilled water lines | Texas Velocity Enterprises, LLC | $1.9 million | Sep 2, 2026 | Sep 1, 2027 |
| 36C25726C0053 | EO 14398 project 671-22-133 repair HVAC dampers audie murphy memorial veterans hospital san antonio, tx | Wichita Falls Tri-tech, LLC | $1.4 million | Aug 3, 2026 | Apr 28, 2027 |
| 36C25726P0594 | EO 14398 replace domestic hot water skid | Warrior Dynamics LLC | $417,307 | Jul 24, 2026 | Jan 20, 2027 |
| 36C25726C0052 | EO 14398 project 671-18-106 replace water softener system audie murphy memorial VA hospital san antonio, tx | Rock Construction Management LLC | $5.1 million | Jun 4, 2026 | Nov 19, 2027 |
| 36C78626C0013 | Urgent HVAC repair services at ft. sam houston national cemetery public restrooms. | Double Bronze Star Marketing And Consulting, Inc | $18,878 | Jun 4, 2026 | Jul 2, 2026 |
| 36C25726P0430 | Medical air gas and piping installation | Mgi, Inc. | $137,849 | May 31, 2026 | Aug 31, 2026 |
| 36C24826P0724 | Deaerator tank inspection | Elite Veteran Solutions, LLC | $12,200 | Apr 17, 2026 | Jul 31, 2026 |
| 36C25726P0366 | Assessment of the chill water lines and steam lines located at audie l. murphy VAMC. | Ksc Federal Contractors LLC | $58,940 | Apr 14, 2026 | May 30, 2026 |
| 36C25726C0035 | EO 14398 671-22-118 replace cast iron drain 2ND and 3RD floor | Hamilton Pacific Chamberlain LLC | $1.3 million | Apr 13, 2026 | Feb 17, 2027 |
| 36C25726C0020 | EO 14398 update CLC HVAC systems | Texas Velocity Enterprises, LLC | $2.3 million | Jan 30, 2026 | Aug 10, 2026 |
| 36C25726C0008 | Project 671-22-179 install devices for legionella control and prevention | Hamilton Pacific Chamberlain LLC | $3.2 million | Nov 3, 2025 | Jan 14, 2027 |
| 36C25725C0074 | Provide all necessary work and services to upgrade the HVAC systems for the 1ST floor lab of the audie l. murphy VA hospital as part of the south texas veterans health care system (stvhcs). | Texas Velocity Enterprises, LLC | $1.8 million | Sep 17, 2025 | Feb 2, 2027 |
| 36C25725P0891 | Stx floor sinks removal and installation | Kb Standard LLC | $31,000 | Sep 10, 2025 | Feb 28, 2026 |
| 36C25725P0611 | Ptrp chiller repairs | Csic Solutions LLC | $144,675 | Aug 1, 2025 | Jul 31, 2026 |
| 36C25725P0680 | Sca pharmacy service | Francisco Beltran | $84,115 | Jul 30, 2025 | May 31, 2026 |
| 36C25725C0038 | 671-25-006 replace hemodialysis HVAC unit | Wichita Falls Tri-tech, LLC | $868,938 | May 22, 2025 | Oct 1, 2026 |
| 36C25725P0356 | Stx emergency sewerage pump and remediation | CLC Services Inc | $45,707 | Mar 21, 2025 | Apr 21, 2025 |
| 36C25725P0139 | Emergency water heater replacement | Design Build Consortium, LLC | $24,654 | Jan 9, 2025 | Jan 17, 2025 |
| 36C25724C0060 | BSL3 HVAC controls replacement | I-2-I Solutions, Inc. | $337,333 | Aug 9, 2024 | May 31, 2025 |
| 36C25723P0232 | Remove and replace five air handling unit coils from three different manufacturers. coils are special order as they are no longer manufactured. some to be manufactured in parts and assembled on site. includes rental cooling units for four months. | Torres Jeffrey J | $438,412 | Feb 24, 2023 | Jun 24, 2023 |
| 36C25723P0130 | Sewer blockage | Milspec Logistics LLC | $18,508 | Dec 23, 2022 | Jan 31, 2023 |
| 36C25723P0055 | Emergency chilled water repair | Allied Fire Protection-sa, LLC | $7,234 | Oct 31, 2022 | Nov 30, 2022 |
| 36C25722P0530 | Stx grease trap repair to bring audie l murphy VA hospital grease trap into code compliance | Milspec Logistics LLC | $78,234 | May 19, 2022 | Jul 18, 2022 |
| 36C25722P0468 | Aaon chiller repair | Mcgoldrick Construction Services Corporation | $93,700 | May 2, 2022 | Sep 30, 2022 |
| 36C25722P0296 | Backflow installation, san antonio VAMC | Torres Jeffrey J | $8,122 | Jan 31, 2022 | Feb 17, 2022 |
| 36C25721P1292 | ED storage room, sprinkler head install | Torres Jeffrey J | $9,221 | Oct 5, 2021 | Oct 12, 2021 |
| 36C25721P0951 | Install 25-TON portable A/C units rental | Consolidated Installation Support, LLC | $64,758 | Jul 25, 2021 | Nov 30, 2021 |
| 36C25721P0832 | Emergency chiller mx for stx VA (kerrville) | Td Industries Inc | $10,119 | May 18, 2021 | Jun 4, 2021 |
| 36C25721P0579 | Emergency replacement of HVAC for MRI equipment in oncology pharmacy, aurora clinic | Pace Building Corporation | $37,240 | Mar 18, 2021 | May 28, 2021 |
| 36C25721P0339 | Emergency water main repair stx VAMC | Consolidated Installation Support, LLC | $18,590 | Jan 13, 2021 | Mar 1, 2021 |
| 36C25720P1554 | Emergency main water line repair | Mueller & Wilson, Inc | $15,294 | Sep 25, 2020 | Oct 2, 2020 |
| 36C25720P1180 | Emergency repair 8 domestic main water line break. | Walz Mechanical, Inc. | $22,350 | Jul 24, 2020 | Aug 31, 2020 |
| 36C25720P0608 | AHU controller replacement | Triple Alliance Enterprises, Inc | $7,890 | Mar 27, 2020 | Apr 30, 2020 |
| 36C25720P0346 | Emergency ptrp shower repair, room 111, south texas veterans health care system, san antonio, tx | Walz Mechanical, Inc. | $4,100 | Jan 17, 2020 | Feb 21, 2020 |
| 36C25720P0247 | HVAC duct repair | Tezel And Cotter Air Conditioning, L.P. | $4,007 | Dec 18, 2019 | Jan 31, 2020 |
| 36C25720P0087 | The contractor shall rovide all labor, materials, services and qualified supervision required install a new exhaust duct in accordance with the statement of work. | Tezel And Cotter Air Conditioning, L.P. | $4,861 | Nov 4, 2019 | Nov 29, 2019 |
| 36C25720P0091 | Emergency test and balance AHU-2 inpatient pharmacy, audie l. murphy medical center, san antonio, tx | Professional Engineer Balance Lab LLC | $5,000 | Oct 31, 2019 | Nov 30, 2019 |
| 36C25719P0308 | Emergency repair of water line | Walz Mechanical, Inc. | $28,000 | Dec 28, 2018 | Jan 31, 2019 |
| VA25717C0107 | San antonio. install air handle for BSL-3 lab | Hamilton Pacific Chamberlain LLC | $186,118 | May 17, 2017 | Aug 28, 2019 |
| VA25715P0341 | Duct cleaning | Sanitary Air, Inc. | $39,785 | Oct 1, 2014 | Sep 30, 2019 |