VA contract 36C24819P1785: Sci air handler coils emergency replacement
Blue Cord Design And Construction, LLC held VA contract 36C24819P1785 for sci air handler coils emergency replacement in Tampa, FL. It started on Jul 18, 2019, and $59,471 has been obligated so far. The VA received a single offer. This contract ended on Sep 30, 2019.
| Contract number | 36C24819P1785 |
|---|---|
| Contract holder | Blue Cord Design And Construction, LLC |
| Holder UEI | WRV2FR811M24 |
| Description | Sci air handler coils emergency replacement |
| Location | Tampa, FL |
| Contracting office | VA Network Contract Office 8 (36C248) |
| Obligated to date | $59,471 |
| Start date | Jul 18, 2019 |
| Current end date | Sep 30, 2019 |
| Offers received | 1 |
| Set-aside | No set-aside |
| Competition | Not competed |
| Kind of work | Maintenance repair |
| Official record | USAspending.gov |
Details come from the official record on USAspending.gov. Confirm them there before relying on them.
Other VA HVAC and plumbing contracts in Tampa, FL
- 36C24826P0597: Urgent domestic water pump skid building 1, $369,975, ends Apr 22, 2027
- 36C24826P0604: Replacement of supply and fuel lines in building 54, $58,084, ended Sep 22, 2026
- 36C24825P1992: Water treatment boiler and chiller, $328,836, ends Dec 14, 2026
- 36C24825P2129: Installation of domestic pump skid, $248,000, ended Sep 14, 2026
- 36C24825P0279: Emergency repair pressure reducing valve, $17,885, ended Dec 31, 2024
- 36C24824C0074: Replace AHU ED-203, $1.7 million, ends Nov 25, 2026
- 36C24824P1797: Emergency rental boiler installation for steam system shutdown, $48,500, ended Jul 29, 2024
- 36C24824P1258: Boiler inspection, testing and calibration service, $168,185, ends May 16, 2027
Other VA contracts held by Blue Cord Design And Construction, LLC
- 36C24824P0682: Emergency boiler plant sump repair, $222,486, ended Sep 30, 2024
- 36C24820P1761: VFD repair, $7,500, ended Sep 4, 2020
- 36C24820P1483: Emergency repair of gas pipe, $48,250, ended Jul 31, 2020
- VA24817C0025: Replace steam distribution and condensate system, $4.1 million, ended Mar 31, 2020