VA contract 36C25219C0204: Project 556-17-017: replace chiller #5
Master Design Build LLC held VA contract 36C25219C0204 for project 556-17-017: replace chiller #5 in North Chicago, IL. It started on Aug 22, 2019, and $1.3 million has been obligated so far. The VA received 5 offers. This contract ended on Aug 26, 2020. If every option is exercised, it could run until Jul 31, 2022.
| Contract number | 36C25219C0204 |
|---|---|
| Solicitation number | 36C25219B0040 |
| Contract holder | Master Design Build LLC |
| Holder UEI | F7NSRFCLTW57 |
| Description | Project 556-17-017: replace chiller #5 |
| Location | North Chicago, IL |
| Contracting office | VA Network Contract Office 12 (36C252) |
| Obligated to date | $1.3 million |
| Start date | Aug 22, 2019 |
| Current end date | Aug 26, 2020 |
| End date with all options | Jul 31, 2022 |
| Offers received | 5 |
| Set-aside | Service-disabled veteran-owned small business (SDVOSB) set-aside |
| Competition | Competed among eligible businesses (set-aside) |
| Kind of work | Construction |
| Official record | USAspending.gov |
Details come from the official record on USAspending.gov. Confirm them there before relying on them.
Other VA HVAC and plumbing contracts in North Chicago, IL
- 36C25226P0574: Provide heating system piping repairs at fhcc building 134 penthouse, north Chicago, il, $99,031, ends Dec 31, 2026
- 36C25226C0026: Contractor shall provide all tools, materials, labor, quality assurance, and supervision for renovations resulting in a complete, compliant, and fully-functional project. EO 14398, $4.0 million, ends Dec 31, 2026
- 36C25226C0032: Construction contract for project 556-23-127 surgical HVAC systems replacement construction at the captain james a lovell federal health care center (fhcc), north Chicago, Illinois, $5.9 million, ends Jul 19, 2027
- 36C25226P0440: Emergency fire alarm system testing inspection and repair service, $486,896, ended Sep 30, 2026
- 36C25226P0119: Emergent fire water utility repair at the fhcc in north Chicago, $36,100, ended Feb 15, 2026
- 36C25225P1275: PM and repair hot water bundle services, $356,320, ends Aug 31, 2027
- 36C25225C0052: Construction project 556-24-106 replace chiller no. 2 at captain james a. lovell federal health care center north Chicago, il 60064-3048, $2.1 million, ends Oct 31, 2026
- 36C25225P0230: Emergency - fire pump and valve repair near building 135, $161,608, ended Jul 17, 2025
Other VA contracts held by Master Design Build LLC
- 36C25219C0224: Project 550-18-102: replace fcus/hot/chilled piping, $1.5 million, ended Feb 1, 2021
- 36C25219C0175: Project 695-16-109 upgrade V10, V11, V30 AHUS (MER2) at the clement j. zablocki VA medical center in Milwaukee, Wisconsin, $7.5 million, ended Apr 16, 2026
- 36C25219C0030: Project 537-19-137, steam system repair, at the jesse brown VA medical center (jbvamc), Chicago, il 60612. the department of veterans affairs requires a contractor to provide all labor, materials, tools, equipment, transportation, and qualified supervision to repair the steam system for building 1, building 11, and building 40 at the jbvamc, $227,491, ended Jun 19, 2020