Master Design Build LLC: VA HVAC and plumbing contracts
Master Design Build LLC (UEI F7NSRFCLTW57) has won 4 VA heating, cooling and plumbing contracts since October 2018, worth $10.4 million, at 4 locations. 0 are still active.
Where does Master Design Build LLC work for the VA?
- Danville, IL: 1 contract
- North Chicago, IL: 1 contract
- Milwaukee, WI: 1 contract
- Chicago, IL: 1 contract
Contracts
| Contract | Description | Location | Obligated | Start | End |
|---|---|---|---|---|---|
| 36C25219C0224 | Project 550-18-102: replace fcus/hot/chilled piping | Danville, IL | $1.5 million | Sep 17, 2019 | Feb 1, 2021 |
| 36C25219C0204 | Project 556-17-017: replace chiller #5 | North Chicago, IL | $1.3 million | Aug 22, 2019 | Aug 26, 2020 |
| 36C25219C0175 | Project 695-16-109 upgrade V10, V11, V30 AHUS (MER2) at the clement j. zablocki VA medical center in milwaukee, wisconsin | Milwaukee, WI | $7.5 million | Jun 25, 2019 | Apr 16, 2026 |
| 36C25219C0030 | Project 537-19-137, steam system repair, at the jesse brown VA medical center (jbvamc), chicago, il 60612. the department of veterans affairs requires a contractor to provide all labor, materials, tools, equipment, transportation, and qualified supervision to repair the steam system for building 1, building 11, and building 40 at the jbvamc. | Chicago, IL | $227,491 | Dec 11, 2018 | Jun 19, 2020 |