| 36C25226P0409 | Boiler retubing EO 14398 | Heat & Power Boiler Service, Inc. | $259,120 | Jul 1, 2026 | Sep 30, 2026 |
| 36C25226C0029 | Sanitary sewer pipe repair - B58 | Armcorp Construction Inc | $96,646 | Apr 10, 2026 | Sep 15, 2026 |
| 36C25226C0023 | Project 550-24-102 replace AHU B102 con | Cavu Consulting LLC | $1.7 million | Mar 23, 2026 | Mar 18, 2027 |
| 36C25225C0061 | Replace an air handling unit (AHU) | Ameritech Contracting LLC | $317,304 | Oct 16, 2025 | Oct 16, 2026 |
| 36C25225P1123 | New- BASE+4 reverse osmosis preventative maintenance service contract for VA illiana health care system | Evoqua Water Technologies LLC | $134,865 | Sep 19, 2025 | Aug 31, 2027 |
| 36C78625P50124 | MWD-809-MR25-0A3 emergency boiler replacement and damaged water lines repair | Ridge Plumbing Contractor LLC | $53,499 | Jan 29, 2025 | May 15, 2025 |
| 36C25224P1245 | Repair, install components, and test sprinkler systems in bldg.'s 14, 58, 102, and 104 as indicated in the sow, at the VA illiana health care center in danville, il | Johnson Controls Fire Protection LP | $34,521 | Sep 26, 2024 | Jan 30, 2025 |
| 36C25224P1024 | Wagd inlet install and survey danville VA medical center | Midwest Medical Gas Service LLC | $8,123 | Sep 16, 2024 | Sep 15, 2025 |
| 36C25224P1136 | Contractor shall provide all labor, material, tools, travel, management, and equipment necessary to dry inspect and clean two water towers (north and south) at 1900 east main street in danville, il | Pittsburg Tank And Tower Maintenance Co., Inc. | $8,800 | Aug 2, 2024 | Dec 31, 2024 |
| 36C25224P0753 | For the one-time emergency boiler tube leak repair(s) at the VA illiana health care system (VA illiana VAMC) located at 1900 e. main st. danville, il 61832-5100. | Jarvis Welding, L.L.P. | $84,900 | Apr 5, 2024 | Aug 31, 2024 |
| 36C25224P0465 | For the emergency boiler useful life study at the VA illiana health care system (VA illiana), located at 1900 e. main st. danville, il 61832-5100. | Coastal Inspection Services,incorporated | $8,980 | Jan 31, 2024 | Apr 30, 2024 |
| 36C25223P1228 | Boiler removal/replacement at danville VA | J3 Enterprise LLC | $99,412 | Sep 29, 2023 | Oct 31, 2023 |
| 36C25223P0079 | Boiler replacement | Ruyle Mechanical Services Inc. | $55,600 | Nov 1, 2022 | Nov 30, 2022 |
| 36C25222P0879 | Delivery and installation of a trane 200 ton air-cooled water chiller for building 58, VA illiana health care system, danville, illinois. | Trane U.S. Inc. | $313,000 | Jun 3, 2022 | Apr 6, 2023 |
| 36C25221P1403 | AHU-6A retrofit to jci controls for danville VAMC | Conserv Inc | $23,960 | Sep 20, 2021 | Nov 18, 2021 |
| 36C25221P1348 | Repair and replacement of steel heating and cooling pipe to copper pipe for danville VAMC | Tarbett Engineering And Construction Svs LLC | $39,338 | Sep 6, 2021 | Jul 1, 2022 |
| 36C25221P0829 | Building 103 chiller maintenance program | Trane U.S. Inc. | $48,382 | Jun 1, 2021 | May 31, 2026 |
| 36C25221P0626 | Emergent chiller repair building 103 | Trane U.S. Inc. | $96,435 | Apr 5, 2021 | May 17, 2021 |
| 36C25220P0789 | Boiler recommissioning | Ruyle Mechanical Services Inc. | $75,740 | Jul 27, 2020 | Sep 25, 2020 |
| 36C25220P0728 | Sprinkler head reorientation b 128 and 129 | Eagle Mechanical Inc | $18,654 | Jul 1, 2020 | Aug 31, 2020 |
| 36C25220P0672 | Establishment/installation of RO waterline from 5TH floor to the 3RD floor of building 58TH VA illiana health care system located in danville, illinois. | Eagle Mechanical Inc | $23,121 | Jun 19, 2020 | Jul 30, 2020 |
| 36C25220P0568 | Emergency chiller repair | Alpha Mechanical Service LLC | $4,596 | Apr 14, 2020 | Apr 28, 2020 |
| 36C25220P0222 | Steam valve replacement. | Eagle Mechanical Inc | $5,764 | Jan 1, 2020 | Feb 15, 2020 |
| 36C25219C0224 | Project 550-18-102: replace fcus/hot/chilled piping | Master Design Build LLC | $1.5 million | Sep 17, 2019 | Feb 1, 2021 |
| 36C25219P1084 | Emergency replacement of new air handler unit | Alpha Mechanical Service LLC | $91,651 | Jul 10, 2019 | Sep 27, 2019 |
| 36C25219P0706 | Sprinkler system inspections | Pipco Companies LTD | $8,950 | May 1, 2019 | Aug 31, 2019 |
| 36C25219P0484 | Removal and replacement 90 sprinkler heads | Pipco Companies LTD | $11,750 | Feb 18, 2019 | May 19, 2019 |
| 36C25219P0366 | Install piping | Eagle Mechanical Inc | $12,650 | Jan 14, 2019 | Feb 15, 2019 |
| 36C25219P0321 | Install water softener and water line | Eagle Mechanical Inc | $6,518 | Jan 1, 2019 | Jan 31, 2019 |
| 36C25219C0046 | Ot:igf:ot dead-legs PHASE-2 B98-B101-B103 | Eagle Mechanical Inc | $366,834 | Dec 28, 2018 | Oct 3, 2019 |
| 36C25219C0045 | Ot:igf:ot correct boiler safety deficiencies | Richard Group LLC | $1.3 million | Dec 27, 2018 | Nov 15, 2019 |
| 36C25218C0196 | Contractor shall provide all labor, materials, equipment, supervision, and all other resources necessary to construct per plans and specifications project 550-15-107, remediate legionella station-wide PHASE-1. the scope of this project is to replace the domestic water distribution system in building 58 and to install a continuous water monitoring system in buildings 39, 58, 101, 103, 128, 129, 130 and 131. | Richard Group LLC | $5.2 million | Jun 29, 2018 | Sep 25, 2020 |