Richard Group LLC: VA HVAC and plumbing contracts

Richard Group LLC (UEI QST7A5N63TL4) has won 10 VA heating, cooling and plumbing contracts since October 2018, worth $25.5 million, at 6 locations. 0 are still active.

Where does Richard Group LLC work for the VA?

Contracts

ContractDescriptionLocationObligatedStartEnd
36C25221C0108Sealed bid award for project 695-19-104, replace fire sprinklers at the milwaukee VA.Milwaukee, WI$1.3 millionSep 24, 2021Sep 1, 2023
36C25221C0100Project 585-20-111 low pressure steam riser at oscar g johnson VA medical center, iron mountain, miIron Mountain, MI$1.1 millionSep 1, 2021Sep 26, 2022
36C25221P0323Replacement of condenser pump at captain james a. lovell federal health care center north chicagoNorth Chicago, IL$42,245Jan 20, 2021Mar 31, 2021
36C25220C0201537-18-301B. legionella correctionsChicago, IL$2.0 millionSep 30, 2020Sep 25, 2022
36C25220C0199Ifb and contract for project 695-19-114, upgrade plumbing for legionella preventionMilwaukee, WI$8.8 millionJul 30, 2020Jun 8, 2026
36C25219C0136Upgrade heat exchangers and replace perimeter heat at oscar g. johnson VA medical center, iron mountain, miIron Mountain, MI$2.5 millionMay 8, 2019Oct 15, 2020
36C25219C0131Upgrade AHU 10&11 construction at the oscar g johnson VA medical center, iron mountain, mi 49801Iron Mountain, MI$1.4 millionApr 30, 2019Jan 23, 2020
36C25219C0045Ot:igf:ot correct boiler safety deficienciesDanville, IL$1.3 millionDec 27, 2018Nov 15, 2019
36C10X18P0195The contractor shall provide all labor, supervision, tools, transportation, equipment, and materials necessary to remove and replace a total of one hundred fifty-four (154) high-efficiency heat pumps of brand name OR equal to section b heat pump data matrix (office setting) and digital ats/temperature sensors that are building automation and control network (bacnet) compatible. units shall be compatible with existing digital data controller (DDC) system and software (alerton building suite V2.6).Hines, IL$2.0 millionSep 26, 2018Sep 25, 2019
36C25218C0196Contractor shall provide all labor, materials, equipment, supervision, and all other resources necessary to construct per plans and specifications project 550-15-107, remediate legionella station-wide PHASE-1. the scope of this project is to replace the domestic water distribution system in building 58 and to install a continuous water monitoring system in buildings 39, 58, 101, 103, 128, 129, 130 and 131.Danville, IL$5.2 millionJun 29, 2018Sep 25, 2020